Temporary works
From request to issued drawings.
Follow a scaffold design package through client feedback, engineering checks and issue to site. See who has the next action at every handoff.
Drawing titlePerimeter access scaffold
Drawing no.TW-014
Rev.C
Package history
One drawing, three handoffs.
Follow the revisions of TW-014 in this example project.
-
Client review · Rev B
Feedback received
The contractor confirms the access location on the marked-up draft.
-
Engineering check · Rev B
Sign-off pending
The verifier still has to close the design check before the package can be issued.
-
Issued to site · Rev C
Receipt recorded
After sign-off, the transmittal shows which revision the site supervisor received.
Lattiral Vision
Keep the decision with the redline.
Share a sheet with an outside reviewer. Follow a numbered markup to its discussion and see which drawing revision the decision belongs to.